Full Lifecycle Industrial Real Estate Comprehensive Service Platform
From early-stage site selection and red line verification to factory handover, legal licensing, and government approvals—providing one-stop closed-loop guarantees for foreign manufacturing investments in Vietnam.
Industrial Parks Network
120+
Average Landing Acceleration
40%
Boundary Line Compliance
100%
Institutional Manufacturing Services
Bespoke transaction structures, turn-key facility deliveries, and direct administrative fast-tracking across Northern and Southern core manufacturing clusters.
01
Industrial Land Acquisition & Secondary Transfer
De-risk your land allocation through institutional due diligence, title purity validation, and sovereign industrial master plan audits across key provinces.
Land Cycle 30–45 Days
Survey Precision 1:500 Red Line
Title Tenure LURC 50-Year
Grid Infrastructure 110kV / 22kV Dual
PARCEL AUDIT:
Hai Phong & Bac Ninh Ready Master Plots
FACILITY SPEC:
Grade-A High Clearance Ready Logistics Hall
02
Ready-Built Factory (RBF) Leasing
High-standard modern industrial spaces pre-engineered for rapid line assembly, cleanroom retrofitting, and international compliance verification with zero lead time.
Availability Immediate Move-In
Asset Reserve 850,000 m²
Floor Loading 3.0–5.0 T/m²
Dock Integration Hydraulic Levelers
03
Build-to-Suit (BTS) Customized Plants
Custom engineered architectural design and turnkey construction conforming to precision manufacturing, pharmaceutical, electronics assembly, and cold chain parameters.
Contract Structure EPC Turnkey
Handover Window 6–9 Months
Quality Control BIM Digital 4D
Structural Code TCVN & NFPA
PROJECT SITE:
High-Tech Precision Assembly Plant 45,000 m²
APPROVAL DESK:
Inter-Ministerial Fast Track Licensing Program
04
Full-Process Investment Landing Support
Eliminate operational friction through end-to-end statutory representation, tax incentive structuring, and environmental approval certifications handled by our licensed Hanoi trade desk.
The first phase of the Tay Pho Yen Industrial Park...
8-Step Closed-Loop Execution Framework
A disciplined, institutional approach designed to compress foreign factory setup cycles from 18 months down to 6–9 months while safeguarding total regulatory compliance.
PHASE 01
Market Research
Cluster industry mapping, local utility tariff analysis, labor pool depth surveys, and logistics cost modeling.
Deliverable
Regional Viability Index
PHASE 02
Resource Matching
Screening 120+ parks against power specs, floor load requirements, wastewater limits, and customs zones.
Deliverable
Target Shortlist of 3 Sites
PHASE 03
Site Due Diligence
On-site geotechnical review, 1:500 red line confirmation, clear legal tenure checks, and flood risk evaluation.
Deliverable
Legal & Physical Audit Dossier
PHASE 04
Scheme Formulation
Architectural schematic concepting, structural planning, CAPEX phasing models, and municipal hookup alignments.